Accod Pet/Dog Training Leash (5M Nylon Dog Lead Dog Long Lead Rope with 360 Degree Rotating Stainless Steel Hook for Small Medium and Large Dog(Black)

$23.99

  • Size:5M long and 2.5cm wide
  • Material:Made of strong nylon and durable metal hook,Strong and wear resistant,Keep your dog under control
  • Metal hook for easy attachment to your dog's own collar,Rotate 360 degrees without entangle,Make your dog play safer,Suitable for outdoor walking training recall and running
  • Material: Nylon
  • Colour: Black

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Accod Pet/Dog Training Leash (5M Nylon Dog Lead Dog Long Lead Rope with 360 Degree Rotating Stainless Steel Hook for Small Medium and Large Dog(Black): Size:5M long and 2.5cm wide. Material:Made of strong nylon and durable metal hook,Strong and wear resistant,Keep your dog under control.

Key features

  • Size:5M long and 2.5cm wide
  • Material:Made of strong nylon and durable metal hook,Strong and wear resistant,Keep your dog under control
  • Metal hook for easy attachment to your dog's own collar,Rotate 360 degrees without entangle,Make your dog play safer,Suitable for outdoor walking training recall and running
  • Material: Nylon
  • Colour: Black

Product specifics

  • Brand: Accod
  • Category: Training Leads
  • Size: 5M
  • Colour: Black
  • Material: Nylon

Additional information

Weight 0.1 kg
brand

Accod

dimensions

‎11.2 x 8.9 x 3.2 cm; 100 Grams