DINGO Dog Walking Belt with Shock Absorber, Large Carabiner for Excess of the Rolled-up Leash, 6 Meters Long Lead

$99.99

  • The leash is 6 meters long, providing adequate freedom of movement for the dog. The leash width is approximately 1.6 cm, making it suitably durable and resistant to abrasion
  • Machine washable at 30 degrees Celsius. Dog walking belts, hands-free leashes, training leads, and other pet equipment are handcrafted in Poland by Dingo – the original brand since 1977
  • Suitable for hands free leads use
  • Material: Polypropylene
  • Colour: black

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

DINGO Dog Walking Belt with Shock Absorber, Large Carabiner for Excess of the Rolled-up Leash, 6 Meters Long Lead: The leash is 6 meters long, providing adequate freedom of movement for the dog. The leash width is approximately 1.6 cm, making it suitably durable and resistant to abrasion. Machine washable at 30 degrees Celsius. Dog walking belts, hands-free leashes, training leads, and other pet equipment are handcrafted in Poland by Dingo – the original brand since 1977.

Key features

  • The leash is 6 meters long, providing adequate freedom of movement for the dog. The leash width is approximately 1.6 cm, making it suitably durable and resistant to abrasion
  • Machine washable at 30 degrees Celsius. Dog walking belts, hands-free leashes, training leads, and other pet equipment are handcrafted in Poland by Dingo – the original brand since 1977
  • Suitable for hands free leads use
  • Material: Polypropylene
  • Colour: black

Product specifics

  • Brand: Dingo Waldemar Rutkowski
  • Category: Hands Free Leads
  • Size: One size
  • Colour: black
  • Material: Polypropylene
  • Model: 99788
  • Part number: 99788

Additional information

Weight 0.17 kg
Brand

DINGO

EAN

5904760997882