Description
Details
RUNEAY Double Adjustable Lead for dogs 3m Long Rope for Small Medium, and Large dogs, 300 centimeters: Tightly woven from strong nylon, RUNEAY double ended lead for dogs is lightweight bite-resistant, strong, stable, tear-resistant, and safe. RUNEAY double ended lead for dogs comes with 2 heavy duty D-shaped hook. The 7.5cm big D-shaped hook very strong and is not easy to break.
Key features
- Tightly woven from strong nylon, RUNEAY double ended lead for dogs is lightweight bite-resistant, strong, stable, tear-resistant, and safe
- RUNEAY double ended lead for dogs comes with 2 heavy duty D-shaped hook. The 7.5cm big D-shaped hook very strong and is not easy to break
- RUNEAY 3m double ended dog lead have 3 O-rings and 2 heavy duty hooks. You can adjust different lengths into 100 cm, 150 cm, 200 cm, 250 cm or the full length 300cm
- Material: Nylon
- Size: 300 centimeters
Product specifics
- Brand: RUNEAY
- Category: Double Leads
- Size: 300 centimeters
- Material: Nylon




