RUNEAY Double Adjustable Lead for dogs 3m Long Rope for Small Medium, and Large dogs, 300 centimeters

$18.99

  • Tightly woven from strong nylon, RUNEAY double ended lead for dogs is lightweight bite-resistant, strong, stable, tear-resistant, and safe
  • RUNEAY double ended lead for dogs comes with 2 heavy duty D-shaped hook. The 7.5cm big D-shaped hook very strong and is not easy to break
  • RUNEAY 3m double ended dog lead have 3 O-rings and 2 heavy duty hooks. You can adjust different lengths into 100 cm, 150 cm, 200 cm, 250 cm or the full length 300cm
  • Material: Nylon
  • Size: 300 centimeters

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

RUNEAY Double Adjustable Lead for dogs 3m Long Rope for Small Medium, and Large dogs, 300 centimeters: Tightly woven from strong nylon, RUNEAY double ended lead for dogs is lightweight bite-resistant, strong, stable, tear-resistant, and safe. RUNEAY double ended lead for dogs comes with 2 heavy duty D-shaped hook. The 7.5cm big D-shaped hook very strong and is not easy to break.

Key features

  • Tightly woven from strong nylon, RUNEAY double ended lead for dogs is lightweight bite-resistant, strong, stable, tear-resistant, and safe
  • RUNEAY double ended lead for dogs comes with 2 heavy duty D-shaped hook. The 7.5cm big D-shaped hook very strong and is not easy to break
  • RUNEAY 3m double ended dog lead have 3 O-rings and 2 heavy duty hooks. You can adjust different lengths into 100 cm, 150 cm, 200 cm, 250 cm or the full length 300cm
  • Material: Nylon
  • Size: 300 centimeters

Product specifics

  • Brand: RUNEAY
  • Category: Double Leads
  • Size: 300 centimeters
  • Material: Nylon

Additional information

Weight 0.36 kg
Brand

RUNEAY