Fenrir, Dog Training Leash, Heavy Duty, Double Ended Carabiner, Long Lead

$73.99

  • Suitable for training leads use
  • Material: Nylon with PVC coating
  • Colour: Black
  • Size: 2.1m

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Fenrir, Dog Training Leash, Heavy Duty, Double Ended Carabiner, Long Lead: Suitable for training leads use. Material: Nylon with PVC coating.

Key features

  • Suitable for training leads use
  • Material: Nylon with PVC coating
  • Colour: Black
  • Size: 2.1m

Product specifics

  • Brand: Fenrir
  • Category: Training Leads
  • Size: 2.1m
  • Colour: Black
  • Material: Nylon with PVC coating
  • Model: Fenrir Training Leash

Additional information

Weight 0.27 kg
Brand

Fenrir Canine Ltd

EAN

5060823311689