Description
Details
Heavy Duty Dog Chain for Yard-10FT Metal Chain Leash Chew Proof,Long Lead for Outside with Strong Swivel Hook,Outdoor Dog Runner for Camping,Tie Out Cable for Medium Large Pet up to 150LBS: Available in 4mm models and lengths of 5/10/15/20/25/30/40FT, 3mm is recommended for small dogs under 90LBS while 4mm and 5mm are for medium and large dogs up to 150-200LBS. Suitable for tie-outs use.
Key features
- Available in 4mm models and lengths of 5/10/15/20/25/30/40FT, 3mm is recommended for small dogs under 90LBS while 4mm and 5mm are for medium and large dogs up to 150-200LBS
- Suitable for tie-outs use
- Material: Stainless Steel
- Colour: SILVER,UP TO 150LBS
- Size: 10FT
Product specifics
- Brand: Furggis
- Category: Tie-Outs
- Size: 10FT
- Colour: SILVER,UP TO 150LBS
- Material: Stainless Steel
- Model: V-4mm-CHAIN




