Heavy Duty Dog Chain for Yard-30FT Metal Dog Chain Leash Chew Proof,Long Lead for Outside with Strong Swivel Hook,Outdoor Pet Runner for Camping,Tie Out Cable for Medium Large Pet up to 150LBS

$97.99

  • Available in 3mm/4mm/5mm models and lengths of 5/10/15/20/25/30/40FT, 3mm is recommended for small dogs under 90LBS while 4mm and 5mm are for medium and large dogs up to 150-200LBS
  • Suitable for basic leads use
  • Material: Stainless Steel
  • Colour: SILVER,UP TO 150LBS
  • Size: 30FT

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Heavy Duty Dog Chain for Yard-30FT Metal Dog Chain Leash Chew Proof,Long Lead for Outside with Strong Swivel Hook,Outdoor Pet Runner for Camping,Tie Out Cable for Medium Large Pet up to 150LBS: Available in 3mm/4mm/5mm models and lengths of 5/10/15/20/25/30/40FT, 3mm is recommended for small dogs under 90LBS while 4mm and 5mm are for medium and large dogs up to 150-200LBS. Suitable for basic leads use.

Key features

  • Available in 3mm/4mm/5mm models and lengths of 5/10/15/20/25/30/40FT, 3mm is recommended for small dogs under 90LBS while 4mm and 5mm are for medium and large dogs up to 150-200LBS
  • Suitable for basic leads use
  • Material: Stainless Steel
  • Colour: SILVER,UP TO 150LBS
  • Size: 30FT

Product specifics

  • Brand: Furggis
  • Category: Basic Leads
  • Size: 30FT
  • Colour: SILVER,UP TO 150LBS
  • Material: Stainless Steel
  • Model: V-4mm-CHAIN

Additional information

Weight 2.18 kg
Brand

Furggis