Description
Details
Herm Sprenger Rubberised Nylon Long Lead Neon Green Reflective (200cm), 6feet: The Herm Sprenger rubberised long lead is made of nylon woven neon green through with a durable black rubber thread and a reflective strip for visibility in low light conditions. With a generous 17cm/16.5cm handle.
Key features
- The Herm Sprenger rubberised long lead is made of nylon woven neon green through with a durable black rubber thread and a reflective strip for visibility in low light conditions
- With a generous 17cm/16.5cm handle
- The resulting lead ensures the on the handle is soothing and safe even in wet or muddy conditions
- Material: Nylon
- Colour: Green
Product specifics
- Brand: Herm Sprenger
- Category: Basic Leads
- Size: 6feet
- Colour: Green
- Material: Nylon
- Model: N0692
- Part number: 5923020073



