JnDee 500 Bright LEDs 50 Metres Multi Colours RGBY String Fairy Lights for Christmas Tree Party Wedding Events 8Modes, Timer, Long Lead

$80.99

  • Low Voltage Kids Pets Safe Design. Comes with a Transformer
  • 8 Modes: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave and Combination
  • Extra 10M extension Lead from the transformer to the 1st lights
  • Material: Plastic
  • Colour: Multi Colours(rgby)

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

JnDee 500 Bright LEDs 50 Metres Multi Colours RGBY String Fairy Lights for Christmas Tree Party Wedding Events 8Modes, Timer, Long Lead: Low Voltage Kids Pets Safe Design. Comes with a Transformer. 8 Modes: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave and Combination.

Key features

  • Low Voltage Kids Pets Safe Design. Comes with a Transformer
  • 8 Modes: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave and Combination
  • Extra 10M extension Lead from the transformer to the 1st lights
  • Material: Plastic
  • Colour: Multi Colours(rgby)

Product specifics

  • Brand: JnDee
  • Category: Indoor
  • Size: 500 LED 50M
  • Colour: Multi Colours(rgby)
  • Material: Plastic
  • Model: SS-31vdc-100LED-L-MC-IP44
  • Part number: SS-31vdc-100LED-L-MC-IP44

Additional information

Weight 0.98 kg
brand

JnDee