Description
Details
JnDee Safe Voltage 300 Bright LEDs 30 Metres Cool White String Fairy Lights for Christmas Tree Party Wedding Events 8 Modes: Fairy Lights: 300 LED Cool White Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 30m Light length & 10m Lead wire. 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination.
Key features
- Fairy Lights: 300 LED Cool White Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 30m Light length & 10m Lead wire
- 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
- Suitable for indoor use
- Colour: Cool White
- Size: 300 LED 30M
Product specifics
- Brand: JnDee
- Category: Indoor
- Size: 300 LED 30M
- Colour: Cool White
- Model: SS-31vdc-100LED-L-MC-IP44
- Part number: SS-31vdc-100LED-L-MC-IP44




