JnDee Safe Voltage 300 Bright LEDs 30 Metres Multi Colours RGBY String Fairy Lights for Christmas Tree Party Wedding Events 8 Modes

$63.99

  • Low Voltage Kids Pets Safe Design. Comes with a Transformer
  • 8 Modes with Memory: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
  • Extra 8M extension Lead from the transformer to the 1st lights
  • Material: Plastic, PVC, Rubber, or Vinyl
  • Colour: Multi Colours(rgby)

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

JnDee Safe Voltage 300 Bright LEDs 30 Metres Multi Colours RGBY String Fairy Lights for Christmas Tree Party Wedding Events 8 Modes: Low Voltage Kids Pets Safe Design. Comes with a Transformer. 8 Modes with Memory: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination.

Key features

  • Low Voltage Kids Pets Safe Design. Comes with a Transformer
  • 8 Modes with Memory: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
  • Extra 8M extension Lead from the transformer to the 1st lights
  • Material: Plastic, PVC, Rubber, or Vinyl
  • Colour: Multi Colours(rgby)

Product specifics

  • Brand: JnDee
  • Category: Indoor
  • Size: 300 LED 30M
  • Colour: Multi Colours(rgby)
  • Material: Plastic, PVC, Rubber, or Vinyl
  • Model: SS-31vdc-100LED-L-MC-IP44
  • Part number: SS-31vdc-100LED-L-MC-IP44

Additional information

Weight 0.72 kg
brand

JnDee