Description
Details
JnDee Safe Voltage 400 Bright LEDs 40 Metres Cool White String Fairy Lights for Christmas Tree Wedding 8 Modes, Timer, Long Lead: Low Voltage Kids Pets Safe Design. Comes with a Transformer. 8 Modes with Memory: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination.
Key features
- Low Voltage Kids Pets Safe Design. Comes with a Transformer
- 8 Modes with Memory: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
- Extra 8M extension Lead from the transformer to the 1st lights
- Material: Plastic
- Colour: Cool White
Product specifics
- Brand: JnDee
- Category: Indoor
- Size: 400 LED 40M
- Colour: Cool White
- Material: Plastic
- Part number: SS-31vdc-100LED-L-MC-IP44




