Description
Details
Joytale Training Leads for Dogs Padded Handle Long Line Dog Lead, 5m 10m 15m 20m Long Leash for Training Play, Camping: The grip of this long line dog leash is neoprene padded which is soft and it can get your hand away from burning while training or playing. With handle, this leash is an ideal dog training leash; To remove the handle it works as good tie out cable for camping or backyard.
Key features
- The grip of this long line dog leash is neoprene padded which is soft and it can get your hand away from burning while training or playing
- With handle, this leash is an ideal dog training leash; To remove the handle it works as good tie out cable for camping or backyard
- Both the hooks of the long lead leash for dog training is made of alloy steel and it’s rust resistant and durable
- Material: Nylon
- Colour: Orange
Product specifics
- Brand: Joytale
- Category: Training Leads
- Size: 20M
- Colour: Orange
- Material: Nylon
- Model: A95001
- Part number: A95001




