Joytale Training Leads for Dogs Padded Handle Long Line Dog Lead, 5m 10m 15m 20m Long Leash for Training Play, Camping

$53.99

  • The grip of this long line dog lead is neoprene padded which is soft and it can get your hand away from burning while training or playing
  • With handle, this lead is an ideal dog training lead; To remove the handle it works as good tie out cable for camping or backyard
  • Both the hooks of the long lead leash for dog training is made of alloy steel and it’s rust resistant and durable
  • Material: Nylon
  • Colour: Orange

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Joytale Training Leads for Dogs Padded Handle Long Line Dog Lead, 5m 10m 15m 20m Long Leash for Training Play, Camping: The grip of this long line dog lead is neoprene padded which is soft and it can get your hand away from burning while training or playing. With handle, this lead is an ideal dog training lead; To remove the handle it works as good tie out cable for camping or backyard.

Key features

  • The grip of this long line dog lead is neoprene padded which is soft and it can get your hand away from burning while training or playing
  • With handle, this lead is an ideal dog training lead; To remove the handle it works as good tie out cable for camping or backyard
  • Both the hooks of the long lead leash for dog training is made of alloy steel and it’s rust resistant and durable
  • Material: Nylon
  • Colour: Orange

Product specifics

  • Brand: Joytale
  • Category: Training Leads
  • Size: 10M
  • Colour: Orange
  • Material: Nylon
  • Model: A95001
  • Part number: A95001

Additional information

Weight 0.56 kg
Brand

Joytale

EAN

6976939760206