KingCarp – 25g Surface Bomb Float and Baited with Pellet – Includes Swivels Rubber Beads and a Long Leader [37-0003]

$25.99

  • 25g Surface Bomb Float – Ready Made and Baited with Pellet – Includes Swivels Rubber Beads and a Long Leader
  • Surface fishing for carp is an exciting and often very effective method – In this package you get everything you need
  • A 25g floating bomb float, swivels, rubber beads, and a long leader on a convenient roll
  • Colour: White

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

KingCarp – 25g Surface Bomb Float and Baited with Pellet – Includes Swivels Rubber Beads and a Long Leader [37-0003]: 25g Surface Bomb Float – Ready Made and Baited with Pellet – Includes Swivels Rubber Beads and a Long Leader. Surface fishing for carp is an exciting and often very effective method – In this package you get everything you need.

Key features

  • 25g Surface Bomb Float – Ready Made and Baited with Pellet – Includes Swivels Rubber Beads and a Long Leader
  • Surface fishing for carp is an exciting and often very effective method – In this package you get everything you need
  • A 25g floating bomb float, swivels, rubber beads, and a long leader on a convenient roll
  • Colour: White

Product specifics

  • Brand: KingCarp
  • Category: Corks, Floats & Bobbers
  • Colour: White

Additional information

Weight 0.04 kg
brand

King

mpn

.