Description
Details
LATRAT Dog Training Lead 0.36 – 30 m Long Lead for Small to Large Dogs (Black 1.2 x 1.5 cm 4 ft), 1.2m*1.5cm(4ft): The dog leash is made of strong and durable nylon material, ideal for walking with your dog without any worries. The carabiner is made of stainless steel. Choose the length that strong suits your needs, you can control your dog from near or far away: 1.2~30m, with multiple colors: dark blue, red or black.
Key features
- The dog leash is made of strong and durable nylon material, ideal for walking with your dog without any worries. The carabiner is made of stainless steel
- Choose the length that strong suits your needs, you can control your dog from near or far away: 1.2~30m, with multiple colors: dark blue, red or black
- The dog leash comes with a rotating buckle that can be easily attached to your dog's collar and rotates 360 degrees so your pet can play safely
- Material: Nylon
- Colour: Black
Product specifics
- Brand: LATRAT
- Category: Training Leads
- Size: 1.2m*1.5cm(4ft)
- Colour: Black
- Material: Nylon
- Model: GS20230228
- Part number: gs20230228




