HuaDmaing Leather Dog Lead Long Leads for Dog Training Leather Belt Safety Traction Rope Perdurable Copper Clasp Stylish Braided Design for Large Medium Small Dogs Training & Walking(4-ft Brown)

$53.99

  • Suitable for training leads use
  • Material: Leather
  • Colour: Dark brown
  • Size: 4 -ft brass hook

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

HuaDmaing Leather Dog Lead Long Leads for Dog Training Leather Belt Safety Traction Rope Perdurable Copper Clasp Stylish Braided Design for Large Medium Small Dogs Training & Walking(4-ft Brown): Suitable for training leads use. Material: Leather.

Key features

  • Suitable for training leads use
  • Material: Leather
  • Colour: Dark brown
  • Size: 4 -ft brass hook

Product specifics

  • Brand: HuaDmaing
  • Category: Training Leads
  • Size: 4 -ft brass hook
  • Colour: Dark brown
  • Material: Leather
  • Model: NC-22-1.5tong-a
  • Part number: NC-22-1.5tong

Additional information

Weight 0.12 kg
Brand

NICE01