LightsGo Waterproof Blue and White Icicle Christmas Fairy Lights 800 Lights 20 Metres Wide Plus Long Lead Cable

$221.99

  • 800 LED Lights 20 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light)
  • 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static
  • Low Voltage Kids Pets Safe Design. The System is 31V and only 4Watt. Even When the Wire is Broken, It Is Still Safe to Pets and Human. It's So Important if You Have Naughty Children Around
  • Colour: Blue,white

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

LightsGo Waterproof Blue and White Icicle Christmas Fairy Lights 800 Lights 20 Metres Wide Plus Long Lead Cable: 800 LED Lights 20 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light). 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static.

Key features

  • 800 LED Lights 20 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light)
  • 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static
  • Low Voltage Kids Pets Safe Design. The System is 31V and only 4Watt. Even When the Wire is Broken, It Is Still Safe to Pets and Human. It's So Important if You Have Naughty Children Around
  • Colour: Blue,white

Product specifics

  • Brand: LightsGo
  • Category: Indoor-Outdoor
  • Colour: Blue,white

Additional information

Weight 1.685 kg
brand

LightsGo

dimensions

‎27.7 x 23 x 17.4 cm; 1.68 Kilograms