LightsGo Waterproof Cool White Icicle Christmas Fairy Lights 120 Lights 4 Metres Wide Plus Long Lead Cable

$60.99

  • 120 LED Lights 4 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light)
  • 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static
  • Low Voltage Kids Pets Safe Design. The System is 31V and only 4Watt. Even When the Wire is Broken, It Is Still Safe to Pets and Human. It's So Important if You Have Naughty Children Around
  • Colour: Cool White
  • Size: 120 Lights 4M

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

LightsGo Waterproof Cool White Icicle Christmas Fairy Lights 120 Lights 4 Metres Wide Plus Long Lead Cable: 120 LED Lights 4 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light). 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static.

Key features

  • 120 LED Lights 4 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light)
  • 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static
  • Low Voltage Kids Pets Safe Design. The System is 31V and only 4Watt. Even When the Wire is Broken, It Is Still Safe to Pets and Human. It's So Important if You Have Naughty Children Around
  • Colour: Cool White
  • Size: 120 Lights 4M

Product specifics

  • Brand: LightsGo
  • Category: Indoor-Outdoor
  • Size: 120 Lights 4M
  • Colour: Cool White

Additional information

Weight 0.406 kg
brand

LightsGo

dimensions

‎17.6 x 15 x 8.7 cm; 406 Grams