LightsGo Waterproof Warm White Icicle Christmas Fairy Lights 120 Lights 4 Metres Wide Plus Long Lead Cable

$47.99

  • 120 LED Lights 4 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light)
  • 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static
  • Low Voltage Kids Pets Safe Design. The System is 31V and only 4Watt. Even When the Wire is Broken, It Is Still Safe to Pets and Human. It's So Important if You Have Naughty Children Around
  • Material: Plastic
  • Colour: Warm White

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

LightsGo Waterproof Warm White Icicle Christmas Fairy Lights 120 Lights 4 Metres Wide Plus Long Lead Cable: 120 LED Lights 4 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light). 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static.

Key features

  • 120 LED Lights 4 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light)
  • 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static
  • Low Voltage Kids Pets Safe Design. The System is 31V and only 4Watt. Even When the Wire is Broken, It Is Still Safe to Pets and Human. It's So Important if You Have Naughty Children Around
  • Material: Plastic
  • Colour: Warm White

Product specifics

  • Brand: LightsGo
  • Category: Indoor-Outdoor
  • Size: 120 Lights 4M
  • Colour: Warm White
  • Material: Plastic
  • Model: b821d6b3-cd37-4713-bf86-ed50b6325c09

Additional information

Weight 0.404 kg
brand

LightsGo

dimensions

‎20.7 x 14.5 x 8.6 cm; 404 Grams