Shower Head Riser Pipe, 8 Inch S Curved Shower Head Extender

$50.99

  • Suitable for fixed showerheads use
  • Material: Stainless Steel
  • Colour: Silver

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Shower Head Riser Pipe, 8 Inch S Curved Shower Head Extender: Suitable for fixed showerheads use. Material: Stainless Steel.

Key features

  • Suitable for fixed showerheads use
  • Material: Stainless Steel
  • Colour: Silver

Product specifics

  • Brand: Agatige
  • Category: Fixed Showerheads
  • Colour: Silver
  • Material: Stainless Steel
  • Model: 2fb12c29-d408-43f6-a79a-29fc2b319210
  • Part number: Agatigegxrgy5u8qt

Additional information

Weight 0.223 kg
Brand

Agatige

EAN

8072880971284