Spanner In The Works®, Bright Green, 59.06 inches

$26.99

  • 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable black dog lead and makes this dog lead a reliable choice for medium to large dogs
  • 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog
  • Suitable for basic leads use
  • Colour: Bright Green
  • Size: 59.06 inches

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Spanner In The Works®, Bright Green, 59.06 inches: 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable black dog lead and makes this dog lead a reliable choice for medium to large dogs. 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog.

Key features

  • 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable black dog lead and makes this dog lead a reliable choice for medium to large dogs
  • 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog
  • Suitable for basic leads use
  • Colour: Bright Green
  • Size: 59.06 inches

Product specifics

  • Brand: Spanner In The Works
  • Category: Basic Leads
  • Size: 59.06 inches
  • Colour: Bright Green
  • Model: Dog-Lead-Parent Listing

Additional information

Weight 0.18 kg
Brand

Spanner In The Works

EAN

5065017273415