Spanner In The Works®, Light Blue, 59.06 inches

$26.99

  • 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable Cyan dog lead making this dog lead a reliable choice for medium to large dogs
  • 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog
  • Suitable for basic leads use
  • Material: Climbing Rope
  • Colour: Light Blue

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Spanner In The Works®, Light Blue, 59.06 inches: 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable Cyan dog lead making this dog lead a reliable choice for medium to large dogs. 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog.

Key features

  • 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable Cyan dog lead making this dog lead a reliable choice for medium to large dogs
  • 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog
  • Suitable for basic leads use
  • Material: Climbing Rope
  • Colour: Light Blue

Product specifics

  • Brand: Spanner In The Works
  • Category: Basic Leads
  • Size: 59.06 inches
  • Colour: Light Blue
  • Material: Climbing Rope
  • Model: Dog-Lead-Parent Listing

Additional information

Weight 0.19 kg
Brand

Spanner In The Works

EAN

5065017273392