Spanner In The Works | Orange Dog Leads For Large Dogs – Reflective Dog Leashes, 1.5 Metre Long Lead, Thick 13mm Anti Pull Dog Leash | Comfort Handle, Hi-Vis Dog Lead, Strong 360 Swivel

$40.99

  • SAFETY FIRST: Safety is a priority, which is why we have manufactured a strong dog Lead with a reflective weave to the lead. This feature enhances visibility during low-light conditions, ensuring your dogs are visible to passing vehicles and pedestrians, ensuring their safety whilst walking or running.
  • STRONG DOG LEAD: Suitable for use with either large or for use as dog leads for medium dogs. Whether you have a majestic Great Dane or a spirited Labrador, our 13mm rope dog lead is designed to cater to their needs. The thick 13mm anti-pull dog leash is perfect for strong, large dogs who tend to pull during walks.
  • SUPERIOR DURABILITY: Crafted with care, our dog lead is made from robust 13mm climbing rope and a strong swivel. Ensuring strength and reliability that can withstand even the most adventurous outings with your best friend.
  • STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable black dog lead and makes this dog lead a reliable choice for medium to large dogs.
  • COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog.

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.19 kg
Brand

Spanner In The Works

EAN

5065017273439