Description
Installation and use: 1 The gauge can be installed and used after testing and sealing. Without sealing or too long storage time, the meter must be re-tested. 2. If you remove the counters from the original packaging and find that the inner packaging or the cover of the meter is defective, do not install the counter. Contact the company’s technical customer service. Only an experienced electrician or a professional technician can install the meter and confirm the reading of the user manual. 4. The gauge must be installed in a ventilated and dry place. The base plate of the gauge must be fireproof on the wall and uncomfortable shaking. 5. The gauge must be installed in the protective box in a dusty place or against possible mechanical damage. 6. The connector must match the connection of the gauge housing or the connection drawing of the user manual. It is recommended to use soft brass wires to input to avoid burning the meter by loose contact. 7. If the meter is properly connected to the mains supply, the power indicator of the meter should light up. 8 In a place with too much thunderstorms to take measures to prevent light damage. 9. The load capacity of the meter is between 0.05 Ib ~ Imax. If the capacity is above the register, the register does not need to be accurate or the power coil must be heated and burned. 10 data display: the meter has two display lines. The first line shows that the power can be deleted. Press the “Reset” button on the front. 3~5 seconds can be set to zero. The second line shows that the total current is not reset. 11 pulse indicator: when the load of the meter is equipped with




