TECHGEAR USB C to Lightning Cable [2M Apple MFi Certified] Strong Braided Lead for iPhone 14/1312/11/Pro/Max/Mini/X/XS/XR/XS Max /8/Plus

$44.99

  • Apple MFi: MFi certification and strict quality testing ensure your Apple devices are charged at their full potential safely, at maximum speed at a secure and stable voltage
  • Long Life: Lasts 30× longer than ordinary cables and able to withstand 30000 bends. The nylon braided cable prevents unexpected scratches, damage and is tangle free
  • Fast Data Transfer: It offers data sync up to 480Mbps, transfer music, movie, files between iPhone and USB-C laptops in seconds
  • Colour: Silver
  • Size: 2m

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

TECHGEAR USB C to Lightning Cable [2M Apple MFi Certified] Strong Braided Lead for iPhone 14/1312/11/Pro/Max/Mini/X/XS/XR/XS Max /8/Plus: Apple MFi: MFi certification and strict quality testing ensure your Apple devices are charged at their full potential safely, at maximum speed at a secure and stable voltage. Long Life: Lasts 30× longer than ordinary cables and able to withstand 30000 bends. The nylon braided cable prevents unexpected scratches, damage and is tangle free.

Key features

  • Apple MFi: MFi certification and strict quality testing ensure your Apple devices are charged at their full potential safely, at maximum speed at a secure and stable voltage
  • Long Life: Lasts 30× longer than ordinary cables and able to withstand 30000 bends. The nylon braided cable prevents unexpected scratches, damage and is tangle free
  • Fast Data Transfer: It offers data sync up to 480Mbps, transfer music, movie, files between iPhone and USB-C laptops in seconds
  • Colour: Silver
  • Size: 2m

Product specifics

  • Brand: TECHGEAR
  • Category: Lightning Cables
  • Size: 2m
  • Colour: Silver
  • Model: 5056284418210
  • Part number: USB TypeC Braided -2m SIL

Additional information

Weight 0.02 kg
brand

TECHGEAR

dimensions

‏
:
‎

17 x 8.6 x 2.2 cm; 20 Grams