Description
Details
dog Training Leash with Carabiner and Padded Handle, Reflective Durable 10M-20M Long Return System for Small Medium, and Large Dogs: Suitable for training leads use. Material: Nylon.
Key features
- Suitable for training leads use
- Material: Nylon
- Colour: Black
- Size: 20M
Product specifics
- Brand: MUXUN
- Category: Training Leads
- Size: 20M
- Colour: Black
- Material: Nylon
- Model: Training Lead for Dogs




