RUNEAY 30m Training Lead for Small Medium Large Dogs with Padded Handle – Long Line for Recall Training (Black)

$32.99

  • Suitable for training leads use
  • Material: Nylon
  • Colour: Black
  • Size: 30 mètres

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

RUNEAY 30m Training Lead for Small Medium Large Dogs with Padded Handle – Long Line for Recall Training (Black): Suitable for training leads use. Material: Nylon.

Key features

  • Suitable for training leads use
  • Material: Nylon
  • Colour: Black
  • Size: 30 mètres

Product specifics

  • Brand: RUNEAY
  • Category: Training Leads
  • Size: 30 mètres
  • Colour: Black
  • Material: Nylon
  • Model: LQQ-176-1

Additional information

Weight 0.33 kg
Brand

RUNEAY