RUNEAY Long Line Dog Lead – 30m, Padded Handle, Recall Training, Suitable for Small to Large Dogs (Red)

$29.99

  • Suitable for training leads use
  • Material: Nylon
  • Colour: Red
  • Size: 30m

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

RUNEAY Long Line Dog Lead – 30m, Padded Handle, Recall Training, Suitable for Small to Large Dogs (Red): Suitable for training leads use. Material: Nylon.

Key features

  • Suitable for training leads use
  • Material: Nylon
  • Colour: Red
  • Size: 30m

Product specifics

  • Brand: RUNEAY
  • Category: Training Leads
  • Size: 30m
  • Colour: Red
  • Material: Nylon

Additional information

Weight 0.33 kg
Brand

RUNEAY