Vivifying Dog Lead, 20FT Reflective Long Line Dog Lead for Outside Yard, Training, Camping, Hiking, Swimming, Beach, Lake (Green)

$73.99

  • The padded cotton is designed to provide extra comfort for your hands during long training without hurting your hands like other long dog lead
  • 360° ROTATING CLASP – Metal clasp is more durable and tougher. Easy to attach your dog collar and remove. Rotates 360 degrees for your dog to play safely
  • Suitable for training leads use
  • Material: Synthetic Fabric
  • Colour: Green

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Vivifying Dog Lead, 20FT Reflective Long Line Dog Lead for Outside Yard, Training, Camping, Hiking, Swimming, Beach, Lake (Green): The padded cotton is designed to provide extra comfort for your hands during long training without hurting your hands like other long dog lead. 360° ROTATING CLASP – Metal clasp is more durable and tougher. Easy to attach your dog collar and remove. Rotates 360 degrees for your dog to play safely.

Key features

  • The padded cotton is designed to provide extra comfort for your hands during long training without hurting your hands like other long dog lead
  • 360° ROTATING CLASP – Metal clasp is more durable and tougher. Easy to attach your dog collar and remove. Rotates 360 degrees for your dog to play safely
  • Suitable for training leads use
  • Material: Synthetic Fabric
  • Colour: Green

Product specifics

  • Brand: Vivifying
  • Category: Training Leads
  • Size: 6m
  • Colour: Green
  • Material: Synthetic Fabric

Additional information

Weight 0.191 kg
Brand

Vivifying

EAN

0712190577896

UPC

712190577896