Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (10FT, Mint Green)

$74.99

  • Strong And Soft Leash: Experience A Leash That Is Both Strong And Gentle. With A Remarkable 600 Pounds Of Pull Resistance, It Provides Safety And Comfort In Various Weather Conditions
  • Suitable for training leads use
  • Material: Nylon
  • Colour: Mint Green
  • Size: 10Ft

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (10FT, Mint Green): Strong And Soft Leash: Experience A Leash That Is Both Strong And Gentle. With A Remarkable 600 Pounds Of Pull Resistance, It Provides Safety And Comfort In Various Weather Conditions. Suitable for training leads use.

Key features

  • Strong And Soft Leash: Experience A Leash That Is Both Strong And Gentle. With A Remarkable 600 Pounds Of Pull Resistance, It Provides Safety And Comfort In Various Weather Conditions
  • Suitable for training leads use
  • Material: Nylon
  • Colour: Mint Green
  • Size: 10Ft

Product specifics

  • Brand: NIMBLE
  • Category: Training Leads
  • Size: 10Ft
  • Colour: Mint Green
  • Material: Nylon
  • Model: dog leash
  • Part number: 01

Additional information

Weight 0.181 kg
Brand

Nimble

EAN

0755749848948

UPC

755749848948