Description
Details
YOGADOG, Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash, Long Lead with Padded Handle, Special Non-slip Design: 10 ft long x 0.7 inch wide long dog leash. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain. Woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog is pulling.
Key features
- 10 ft long x 0.7 inch wide long dog leash. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
- Woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog is pulling
- Training leash with neoprene padded hand loop. Lightweight and comfortable in your hands. Upgraded stronger metal hook
- Material: Nylon
- Colour: Black
Product specifics
- Brand: YOOGAO Pet
- Category: Training Leads
- Size: 10Ft
- Colour: Black
- Material: Nylon
- Model: 43501-3754
- Part number: 43501-3754




