YOGADOG, Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash, Long Lead with Padded Handle, Special Non-slip Design

$92.99

  • 10 ft long x 0.7 inch wide long dog leash. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
  • Woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog is pulling
  • Training leash with neoprene padded hand loop. Lightweight and comfortable in your hands. Upgraded stronger metal hook
  • Material: Nylon
  • Colour: Black

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

YOGADOG, Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash, Long Lead with Padded Handle, Special Non-slip Design: 10 ft long x 0.7 inch wide long dog leash. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain. Woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog is pulling.

Key features

  • 10 ft long x 0.7 inch wide long dog leash. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
  • Woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog is pulling
  • Training leash with neoprene padded hand loop. Lightweight and comfortable in your hands. Upgraded stronger metal hook
  • Material: Nylon
  • Colour: Black

Product specifics

  • Brand: YOOGAO Pet
  • Category: Training Leads
  • Size: 10Ft
  • Colour: Black
  • Material: Nylon
  • Model: 43501-3754
  • Part number: 43501-3754

Additional information

Weight 0.204 kg
brand

YOGADOG

dimensions