Description
Details
Dog Leash Extra Long Training Dog Lead with Special Non-Slip Design and Padded Handle, 5/10/15 m, for Any Size of Dogs (5m): 15 ft long x 0.7 inch wide long dog leash. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain. Woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog is pulling.
Key features
- 15 ft long x 0.7 inch wide long dog leash. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
- Woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog is pulling
- Training leash with neoprene padded hand loop. Lightweight and comfortable in your hands. Upgraded stronger metal hook
- Material: Nylon
- Colour: Blue
Product specifics
- Brand: YOOGAO Pet
- Category: Basic Leads
- Size: 5m
- Colour: Blue
- Material: Nylon
- Model: 11261876
- Part number: 11261876




