Description
Details
YOGADOG, Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash, Long Lead with Padded Handle, Special Non-slip Design: 50 ft long x 0.7 inch wide. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain. With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling.
Key features
- 50 ft long x 0.7 inch wide. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
- With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling
- With neoprene padded hand loop. Lightweight and comfortable in your hands
- Material: Nylon
- Colour: Black
Product specifics
- Brand: YOOGAO Pet
- Category: Training Leads
- Size: 50'
- Colour: Black
- Material: Nylon
- Model: TL-01-15m
- Part number: TL-01-15m




