YOGADOG, Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash, Long Lead with Padded Handle, Special Non-slip Design

$127.99

  • 50 ft long x 0.7 inch wide. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
  • With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling
  • With neoprene padded hand loop. Lightweight and comfortable in your hands
  • Material: Nylon
  • Colour: Black

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

YOGADOG, Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash, Long Lead with Padded Handle, Special Non-slip Design: 50 ft long x 0.7 inch wide. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain. With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling.

Key features

  • 50 ft long x 0.7 inch wide. quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
  • With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling
  • With neoprene padded hand loop. Lightweight and comfortable in your hands
  • Material: Nylon
  • Colour: Black

Product specifics

  • Brand: YOOGAO Pet
  • Category: Training Leads
  • Size: 50'
  • Colour: Black
  • Material: Nylon
  • Model: TL-01-15m
  • Part number: TL-01-15m

Additional information

Weight 0.712 kg
brand

YOGADOG

dimensions

‎30 x 30 x 2 cm; 650 Grams