20pcs Electrolytic Capacitor, 450V 22uf Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier

$22.99

  • [Stable Performance] — quality electrolytic capacitors with stable performance
  • [Specification] — Working Voltage: DC 450V; Surge voltage: DC 500V; Value: 22uf; Capacitance Tolerance: ±20%; Operating temperature: 105; Dissipation Factor:
  • [Durable &Long Life] — Heat resisting, low leakage, low loss and low impedance
  • Material: Aluminum, Electrolyte

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

20pcs Electrolytic Capacitor, 450V 22uf Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier: [Stable Performance] — quality electrolytic capacitors with stable performance. [Specification] — Working Voltage: DC 450V; Surge voltage: DC 500V; Value: 22uf; Capacitance Tolerance: ±20%; Operating temperature: 105; Dissipation Factor:.

Key features

  • [Stable Performance] — quality electrolytic capacitors with stable performance
  • [Specification] — Working Voltage: DC 450V; Surge voltage: DC 500V; Value: 22uf; Capacitance Tolerance: ±20%; Operating temperature: 105; Dissipation Factor:
  • [Durable &Long Life] — Heat resisting, low leakage, low loss and low impedance
  • Material: Aluminum, Electrolyte

Product specifics

  • Brand: Vikye
  • Category: Capacitors
  • Material: Aluminum, Electrolyte
  • Part number: Vikyesrcyu1niqb

Additional information

Weight 0.07 kg
brand

Vikye

dimensions


:

8 x 7 x 6 cm; 70 Grams