30m Long Dog Lead, DELEE Long Leads for Dog Training with Padded Handel, Durable Nylon Lead for Pet Training Recall Obedience, Tracking, Camping Play, Backyard(30m, Black)

3,396

  • 30M Extra Long Dog LeadDELEE Dog Training Lead has a long line with 30m which can give the dog more freedom. They can walk or run freely in backyard, beach, lawn and don not worry about them getting lost
  • Dog Training Lead with Padded HandleDELEE Dog Training Lead has Padded handle which is great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming
  • Long Dog Lead for Recall TrainingDELEE dog training leash is great for teaching your dog recalls. It has the length needed to allow them to wander and ensure your command to come! is obeyed. Allows you to teach your dog recalls and other obedience skills
  • Widely UseDELEE Dog Training Lead is suitable for dogs of different sizes like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds
  • Durable Long Dog LeadDELEE Long Line Dog Lead is made of strong nylon and high quality and 7cm durable big metal hook which to made DELEE long dog training lead more durable and heavy duty, easy to wear and remove.

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.4 kg
Brand

DELEE