Dingo Waldemar Rutkowski Tug Toy for Dogs, Hand Sewn Microfibre & Polypropylene Dog Chaser for Training Agility, Tug of War

$50.99

  • The dog toys are suitable for small to medium breeds that enjoy prey-style games, fetch work, agility, chasing the prey and interactive daily training
  • Original Dingo dog chaser toys, hand sewn in Poland with strong stitching and attention to detail; each piece unique due to manual production and careful workmanship
  • Suitable for interactive toys use
  • Material: Polypropylene
  • Colour: Assorted

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

Dingo Waldemar Rutkowski Tug Toy for Dogs, Hand Sewn Microfibre & Polypropylene Dog Chaser for Training Agility, Tug of War: The dog toys are suitable for small to medium breeds that enjoy prey-style games, fetch work, agility, chasing the prey and interactive daily training. Original Dingo dog chaser toys, hand sewn in Poland with strong stitching and attention to detail; each piece unique due to manual production and careful workmanship.

Key features

  • The dog toys are suitable for small to medium breeds that enjoy prey-style games, fetch work, agility, chasing the prey and interactive daily training
  • Original Dingo dog chaser toys, hand sewn in Poland with strong stitching and attention to detail; each piece unique due to manual production and careful workmanship
  • Suitable for interactive toys use
  • Material: Polypropylene
  • Colour: Assorted

Product specifics

  • Brand: Dingo Waldemar Rutkowski
  • Category: Interactive Toys
  • Size: Long handle
  • Colour: Assorted
  • Material: Polypropylene
  • Model: 15574
  • Part number: 15574

Additional information

Weight 0.085 kg
brand

Brand: Dingo Waldemar Rutkowski

dimensions