JnDee Safe Voltage 300 Bright LEDs 30 Metres Cool White String Fairy Lights for Christmas Tree Party Wedding Events 8 Modes

$50.99

  • Fairy Lights: 300 LED Cool White Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 30m Light length & 10m Lead wire
  • 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
  • Suitable for indoor use
  • Colour: Cool White
  • Size: 300 LED 30M

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

JnDee Safe Voltage 300 Bright LEDs 30 Metres Cool White String Fairy Lights for Christmas Tree Party Wedding Events 8 Modes: Fairy Lights: 300 LED Cool White Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 30m Light length & 10m Lead wire. 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination.

Key features

  • Fairy Lights: 300 LED Cool White Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 30m Light length & 10m Lead wire
  • 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
  • Suitable for indoor use
  • Colour: Cool White
  • Size: 300 LED 30M

Product specifics

  • Brand: JnDee
  • Category: Indoor
  • Size: 300 LED 30M
  • Colour: Cool White
  • Model: SS-31vdc-100LED-L-MC-IP44
  • Part number: SS-31vdc-100LED-L-MC-IP44

Additional information

Weight 0.72 kg
brand

Brand: JnDee

dimensions