JnDee Safe Voltage 400 Bright LEDs 40 Metres Blue String Fairy Lights for Christmas Tree 8 Modes, Timer, Long Lead

$62.99

  • Fairy Lights: 400 LED Blue Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 40m Light length & 10m Lead wire
  • 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
  • Suitable for indoor use
  • Colour: Blue
  • Size: 400 LED 40M

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

JnDee Safe Voltage 400 Bright LEDs 40 Metres Blue String Fairy Lights for Christmas Tree 8 Modes, Timer, Long Lead: Fairy Lights: 400 LED Blue Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 40m Light length & 10m Lead wire. 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination.

Key features

  • Fairy Lights: 400 LED Blue Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 40m Light length & 10m Lead wire
  • 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
  • Suitable for indoor use
  • Colour: Blue
  • Size: 400 LED 40M

Product specifics

  • Brand: JnDee
  • Category: Indoor
  • Size: 400 LED 40M
  • Colour: Blue
  • Model: SS-31vdc-100LED-L-MC-IP44
  • Part number: SS-31vdc-100LED-L-MC-IP44

Additional information

Weight 0.8 kg
brand

JnDee

dimensions

‎22.2 x 12.2 x 11.2 cm; 799.99 Grams