KUM AZ104.06.16-M Long Cone Sharpener Magnesium Stenograph 400 5L Pencil Sharpener for Long Lead Tips Silver, Pack of 3

$29.99

  • The long-cone sharpener from Kum ensures extra long and precise tips, ideal for detailed work
  • A curved knife protects the lead from breakage and delivers a particularly even tip
  • Grooves in the housing provide a secure grip and allow for comfortable sharpening
  • Material: Magnesium
  • Colour: silver

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Description

Details

KUM AZ104.06.16-M Long Cone Sharpener Magnesium Stenograph 400 5L Pencil Sharpener for Long Lead Tips Silver, Pack of 3: The long-cone sharpener from Kum ensures extra long and precise tips, ideal for detailed work. A curved knife protects the lead from breakage and delivers a particularly even tip.

Key features

  • The long-cone sharpener from Kum ensures extra long and precise tips, ideal for detailed work
  • A curved knife protects the lead from breakage and delivers a particularly even tip
  • Grooves in the housing provide a secure grip and allow for comfortable sharpening
  • Material: Magnesium
  • Colour: silver

Product specifics

  • Brand: KUM
  • Category: Pencil Sharpeners
  • Colour: silver
  • Material: Magnesium
  • Model: AZ104.06.16-M
  • Part number: AZ104.06.16-M

Additional information

Weight 0.03 kg
Brand

KUM

EAN

4064900066906